IT Battery Test System
BTS Battery Test System is a high-performance, modular battery testing platform designed to evaluate battery performance, safety, and reliability under multiple charging and discharging conditions. It supports a wide range of charging modes—including CC (constant current), CV (constant voltage), CP (constant power), pulse, and hybrid methods—and various discharge modes to ensure accurate simulation of practical battery applications. The system is designed with modular architecture for easy maintenance and upgrade, and incorporates advanced protection features such as anti-reverse connection, overcurrent protection, and data loss prevention, ensuring safe and reliable operation during intensive testing.
Key System Parameters
| Model | BTS-5V6A80CH | BTS-5V12A80CH | BTS-5V30A80CH | BTS-5V60A80CH |
|---|---|---|---|---|
| Max Power | 2.4 kW | 4.8 kW | 12 kW | 12 kW |
| Channels Quantity | 80CH | 80CH | 80CH | 80CH |
| Output Voltage Range (Charging) | 0 V ~ 5 V | |||
| Output Voltage Range (Discharge) | 1 V ~ 5 V | |||
| Voltage Accuracy | ± 0.02% F.S.@25±5â | |||
| Voltage Resolution | 0.01 mV | |||
| Output Current Range | -6 A ~ +6 A | -12 A ~ +12 A | -30 A ~ +30 A | -60 A ~ +60 A |
| Current Accuracy | 0.3 A / 3 A / 6 A /12 A | 0.3 A / 3 A / 6 A /12 A | 1 A / 3 A / 15 A /30 A | 20 A / 60 A |
| Current Accuracy F.S. | ± 0.05% F.S.@25±5â | |||
| Current Resolution | 0.01 mA | |||
| Current Response Time | ≤ 5 ms | |||
| Current Conversion Time | ≤ 10 ms | |||
| Minimum Recording Interval | 50 ms / 0.1 mV / 0.1 mA (supports 10 ms customization) | |||
| Charge-Discharge Operation Modes | CC, CV, CP, CC-CV, CR, DCIR, Pulse, etc. | |||
| Efficiency | Charging: 70%; Regenerative: 65% | |||
This modular battery testing system is ideal for battery research, production testing, and academic laboratories requiring precise, safe, and programmable multi-channel battery evaluation.
